欧美图一区,精品一区二区人妻 超碰,一极全黄高清无码,国产一区精品自拍视频

新聞詳細(xì)


SBR污水處理工藝詳解

發(fā)布時(shí)間:

2024-04-26 08:17

SBR是序批式活性污泥法的簡稱,又稱間歇式活性污泥法,是一種間歇曝氣方式來運(yùn)行的活性污泥工藝。

  相較于其他工藝不同只需在一個(gè)池體內(nèi)按照時(shí)間順序變成不同的反應(yīng)階段。

  工作過程分為進(jìn)水階段、反應(yīng)階段、沉淀階段、閉水階段、待機(jī)階段。

第一步:從進(jìn)水開始達(dá)到設(shè)備最大容積結(jié)束。

第二步:反應(yīng)時(shí)可根據(jù)不同微生物的生長特點(diǎn)、污水的性質(zhì)和要達(dá)到處理效果,采用非限制曝氣、半限制曝氣、和限制曝氣方式運(yùn)行,通過控制反應(yīng)室中污水的溶解氧達(dá)到厭氧、缺氧、好氧反應(yīng)環(huán)境,完成多種處理功能,不僅可以達(dá)到去除有機(jī)物的目的,而且可以取得脫氮和除磷的效果。

第三步:沉淀階段,目的是進(jìn)行固液分離相當(dāng)于二沉池沉淀時(shí)間通常設(shè)置為11.5小時(shí),直至污泥絮體和上清液分離

第四布:閉水階段是從反應(yīng)器中使用潷水器將上清液排出,一直排放到最低水位。

到下次進(jìn)水開始為待機(jī)階段,可在該階段進(jìn)行多余污泥排放。

該設(shè)備具備占地面積小、構(gòu)造簡單、投資低、運(yùn)行成本低、脫氮除磷效果高等優(yōu)點(diǎn)。

SBR is the abbreviation of sequential batch activated sludge method, also known as intermittent activated sludge method, which is an activated sludge process operated by intermittent aeration method.

Compared with other processes, it only takes one pool to change to different reaction stages in chronological order.

The work process is divided into water inlet stage, reaction stage, precipitation stage, closed water stage and standby stage.

Step 1: From the beginning of water intake to the end of the maximum volume of the equipment.

Step 2: According to the growth characteristics of different microorganisms, the nature of the sewage and the treatment effect to achieve, it can be operated by non-restricted aeration, semi-limited aeration, and limited aeration. By controlling the dissolved oxygen of the sewage in the reaction chamber, it can achieve anaerobic, hypoxia and aerobic reaction environment, and complete a variety of treatment functions. In order to achieve the purpose of removing organic matter, and the effect of nitrogen removal and phosphorus removal can be achieved.

Step 3: The purpose of the sedimentation stage is to carry out solid-liquid separation, which is equivalent to the precipitation time of the second sedimentation tank, which is usually set to 1-1.5 hours until the sludge floc and the supernatant are separated.

Fourth cloth: The closed water stage is to discharge the supernatant by using a decanter in the reactor until the lowest water level.

The next water intake is in the standby stage, and excess sludge can be discharged at this stage.

The equipment has the advantages of small footprint, simple structure, low investment, low operating cost, and high nitrogen and phosphorus removal effect.

 

SBR污水處理工藝詳解

激情综合一区二区迷情校园| 亚洲精品成人片在线播放| 国产日韩在线欧美视频| 免费无码成人AV片在线在线播放| 欧美日韩亚洲tv不卡久久| www.久久久久| 久久伊人| 色综合色| 张丽与黑人巨大30厘米| 久久成人绳艺捆绑| 99精品人妻| 亚洲成a人| 欧美日韩www| av天堂.com| 女人18毛片水真多| 成人亚洲av| 亚洲激情一区二区| 你懂的网| 国产不卡a| 日本在线高清| 国产精品久久久久一区二区三区 | 亚洲天堂国产| 国产va免费精品观看| 五月激激激综合网色播| 两女女百合互慰AV赤裸无遮挡| 国产乱码免费卡1卡二卡3卡四卡| 日本高清中文字幕免费一区二区| 亚洲国产精品一区二区成人片不卡| 亚洲AV永久无无码精品一区二区三区| 乌鲁木齐市| 海宁市| 久久精品国产亚洲AV麻豆~| 欧美色蜜桃97| 中文无码AV电影在线观看网站 | 91精品国产一级毛片国语版| 漂亮人妻被强中文字幕| 又黄又爽又色的视频| 精品一区二区三区视频网站| 99RIAV国产精品视频| 成人国产精品免费视频| 国产精成人品日日拍夜夜|